Draft:NGCP abbreviations

From Wikipedia, the free encyclopedia
  • Comment: Clearly no intension to even try to improve KylieTastic (talk) 10:03, 23 November 2023 (UTC)
  • Comment: A single source isn't going to cut it. Every single material statement must be sourced. Please try to understand our policies and guidelines- further submissions without improvement will lead to a rejection. Qcne (talk) 14:26, 22 November 2023 (UTC)
  • Comment: Please read WP:VERIFY. Further submissions without sources will lead to a rejection. Qcne (talk) 13:48, 22 November 2023 (UTC)
  • Comment: I'm sorry, but I don't think this is a suitable Wikipedia article. It firstly has zero sources - a hard requirement for all articles - and also has no context, so fails that. Qcne (talk) 13:22, 22 November 2023 (UTC)

Abbreviations (NGCP)
Uses Abbreviation input Abbreviation examples Using?
Input (voltage_code)LI(circuit)(from)-(dest) 8LI1BBB-BBB (BBB stands for example) Yes (only on Wikipedia)
Input with pole number (voltage_code)LI(circuit)(from)-(dest) <space> (pole_number)) 8LI1BBB-BBB 123/(8LI1BBB-BBB)123 Yes (on steel poles)
Information Country or company Confirm (Yes) No
Country used Philippines X
Company used on NGCP X
Adopted on Since NGCP owns transmission network X
First used on Hermosa-Duhat-Balintawak Transmission Line X

Introduction[edit]

The NGCP abbreviation and pole number [1]is an easy key to maintain overhead lines and help the crews to read during maintenance.. The abbreviation consists of: standard voltage code, circuit, from substation (three letter only like DUH - Meralco/NGCP Duhat Substation) and to substation (three letter only) or you can add pole number at the end of abbreviation. The abbreviation prints to the reflective yellow adhesive sticker and rotates to 90° to save space around the pole.

Examples[edit]

•8LI1DUH-HER - Hermosa-Duhat segment circuit 1, 230kV

•8LI1QUE-DUH - Duhat-Quezon segment circuit 1, 230kV

•8LI2DAS-LPI and 8LI1DAS-LPI - Dasmariñas-Las Piñas segment circuits 1 & 2, 230kV

•9LI2HER-SJO and 9LI1HER-SJO - Hermosa-San Jose del Monte segment circuits 1 & 2, 500kV

and so on....

History[edit]

Since NGCP is the owner of transmission facilities, the NGCP started to put abbreviation and pole number (or commonly known as "pole tag"). They wanna put first on Hermosa-Duhat-Balintawak Transmission Line, the first transmission line along expressway. They put abbreviation and pole number (or pole tag) on steel poles along Hermosa-Duhat segment and even Duhat-Balintawak segment before other transmission lines put their pole tags.

(re-editable history)

Standard NGCP voltage codes[edit]

  • 7 - 138kV
  • 8 - 230kV
  • 9 - 500kV

Abbreviations of substations[edit]

Go to TagaSanPedro's wiki

Gallery[edit]

Coming soon

8LI1CON-CLK (example)[edit]

  • CLK - 230kV Clark Substation

References[edit]

  1. ^ NGCP official website, unknown (March 21, 2022). "NGCP website". NGCP official website. Retrieved March 19, 2022.